亚洲无码一二三四区_av无码精品一区二区三区_久久无码精品系列_熟妇人妻无码一区二区三区_欧美亚洲免費久久久_天堂国产+人+综合+亚洲欧美_人妻少妇88久久中午字幕

LANGUAGE

SEARCH
CTGR Qinghai Qingyu DC 100MW CSP Project
First batch of large-scale scenic base projects in Qinghai
100MW CT CSP and 900MW PV
Project Overview

The total installed capacity of CTGR Qinghai Qingyu DC Phase II Section 3 project is 1000MW, including PV of 900MW and Tower CSP of 100MW. The 100MW CSP project adopts the molten salt tower CSP technology and is in the southern part of Wutumeiren Solar Power Park, Geermu City, Haixi state, Qinghai Province.

Powerchina Northwest, Cosin Solar, and Energy China ZTPC, won the EPC project of CTGR Qinghai Qingyu DC 100MW CSP Project. According to the division of responsibility, Cosin Solar will participate in the overall design and project management and be responsible for the technical scheme of the solar block, equipment supply, as well as related commissioning and trial operation guidance services.


Parameter Introduction
Installed Capacity
100MW
Storage
12 Hours with Molten Salt
Land Area
2.86km2
Solar Field Reflective Area
711,930m2
Heliostat Numbers
23,731
Distance from Ground to the Center of Receiver
210m
Electrical Output
227 GWh/year
Consult Now
Molten Salt Energy Storage System
Tel:0571-86637361
Tower Concentrating Solar Power System
Tel:0571-81119302
PV Tracker System
Tel:0571-86637885